Tuesday, March 30, 2010

HP QC Certification Sample Papers (HP0-M15) dumps

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192








(1) What is the foundation of Release Module?
a) Release Folder
b) Release
c) Requirement folder
d) Defects

(2) What constitutes the Release Module?
a) Release name, folder, cycles
b) Release folder, defects, cycles

(3) How many core modules are available in QC9.2?
a) 3
b) 4
c) 5
d) 6

(4) What best describes Quality Center9.2?
repository

(5) How many buttons are available to create Release Tree in Release Module?
a) one
b) two
c) three
d) four

(6) How do you mark a Test as Template Test?
a) The test type chosen must be MANUAL-TEMPLATE
b) The first step in the test must be named template test
c) Right-click on the test name and choose Template Test
d) During test planning, mark the checkbox, under details, labeled template Test

(7) To reuse a Test, is it required that the called test should be a Template Test?
a) yes, only template tests are reusable
b) no, the test must be a VAPI test to be reusable
c) yes, template tests are reusable automated tests
d) no, tests do not need to be template tests to be reused

(8) When can you enter the parameters in a called test?
a) values are assigned from within the calling test
b) values must be assigned when the test is executed
c) values are assigned during test design or execution
d) values must be assigned when the test is called, during test design

(9) Once a Test Set is deleted, which contains the tests that you had created, can it be restored?
a) no, once a test is deleted, it is gone
b) yes, the tests can be recovered from the Subject folder
c) yes, the test can be recovered from the Unattached folder
d) no, only Project Managers have permission to recover deleted tests

(10) If you want to notify your project manager that there is in a Test Box there are not enough permissions. What is the best way to do that?
a) Using Alerts
b) using Notification tab
c) sending email

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

(11) If the license is made available, then which of the QC modules become available to access. Specify two?
a) Release
b) requirements
c) Business Process Testing
d) Dashboard
e) Open view

(12) What are the important features of a Requirements while adding in QC9.2?
a) Precise
b) Bounded
c) planned
d) defect free

(13) At what stage the testing begins in QC9.2?
a) Release
b) requirements
c) Test plan
d) Test Execution

(14) Where is common toolbar located on QC9.2?
a) Top left hand corner
b) Top right hand corner
c) bottom left hand cornet
d) bottom right hand corner

(15) What information does coverage analysis view show?
Name of Requirement; Direct coverage Status; Coverage Analysis

(16) How many views are available in Defect Module?
a) one
b) two
c) three
d) four

(17) What is the example of indicator column in defect module?
a) attachments
b) defects
c) requirement

(18) How do you run an automated test concurrently on multiple remote hosts in a test set?
a) create test instance on the same test and execute on different host
b) create group of hosts and execute same test
c) can not be done

(19) Which button or menu will allow you to view additional fields in the Defects Grid?
a) select columns
b) show all

(20) Which module allows you to view coverage by cycle?
a) release
b) requirements
c)Test plan
d) test lab

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

(21) Which module/s allow you to link defects?
a) requirements, test plan
b) release, test plan
c) release test plan, test lab
d) requirements, test plan, test lab

(22) Can you see the QC9.2 version through Tools menu?
NO

(23) What are the two steps performed in Risk Analisys?
a) Impact analysis
b) risk analysis
c) failure probability
d) test timelines
e) testing recources

(24) What level of analysis is done while performing Risk Analysis?
Full, Partial, Basic and None

(25) What data is displayed in Live Analysis graphs?
a) all the tests in the Test Plan
b)all the cycles or releases the test is linked to
c) all the requirements linked to the specified test
d) all the tests in a specified folder in the Test Plan

(26) Analysis reports are available in which modules?
a) relase, test plan, defects
b) release, defects, test lab
c) Requirements, test plan, test lab

(27) What kind of graphs are available for all the modules in QC9.2?
a) summary and progress
b) summary and trend
c) requirements coverage and progress
d) defect age and summary

(28) Which functional HP tools are supported by QC9.2?
a) HP OpenView
b) HP WinRunner
c) HP QuickTest Professional
d) HP LoadRunner
e) HP Change Control Management

(29) Which link should be clicked to log-on to QC9.2?
a) Quality Center
b) Site administrator
c) Business Process
d) Authenticate

(30) Which module shows the overall status of a project which can be used by Project Managers?
a) Quality Center Foundation
b) Business Process Insight
c) Service Test Component
d) Quality Center Dashboard

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

(31) After running macros in excel sheet, which icons of QC are visible?
Export to QC

(32) Defects can be exported in which file format?
a) .xls
b).doc
c).tmp
d).htm

(33) Which data can be imported from external file?
Defect; Test; Requirement

(34) What does " * " mark against Test Script tab indicate in a Test Plan?
a) There is a test script
b) there is no test script
c) this is a manual test
d) test script has been changed

(35) What is a test set tree?
a) Collection of tests to be executed
b) group of automated tests
c) collection of test set folders

(36) When defect is logged then detected by field is taken from.
a) user who has linked with the defect
b) user who has currently logged in
c) user who has executed the test
d) none

(37) When template test is used?
A template test is used to reusable steps and parameters are required.

(38) Using which technique data is generated in Excel Report Generator.
a) SQL Query
b) Data exaction technique
c) import data to excel

(39) What is use of Create Release button?
a) create new release
b) create new release folder
c) create release tree

(40) Why parameter is used in excel report generator?
a) enables the report to be saved
b) enables the user to name the report
c) enabled report to be used across projects
d) enables the report to be used for different purposes

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

(41) What are characteristic of test case?
Consistence; unique; precise; appropriate

(42) Which are default requirements?
a) Testing
b) functional
c) performace
d) unattached

(43) Defects can be linked to which entities of QC
a) Requiremenrs, defects, test plan, test lab
b) requirements, defects, test plan, test instance
c) release, requirements, defects
d) release, test plan, test lab, defects

(44) Predefined reports/graphs available in which file format.
a) .xls
b) .xml
c).htm
d) .doc

(45) Which name is displayed as designer in details tab of excel report generator be defalut?
a) User who is generating report
b) user who has logged in
c) user who has designed the report
d) any quality center user

(46) Which fields can be modified using details tab of release?
a) name
b) end date
c) cycle name
d) requirement details

(47) Excel macro is installed on your machine then what can be imported in QC.
Requirement; Test Plan; Defect

(48) Word macro is installed on your machine then which toolbar appears in QC.
a) common, requirements, test plan
b) common, test plan, release
c) release, requirements, defects
d) test plan, defects, test lab

(49) Where is the standard toolbar displayed in QC?
Below the Menu Bar

(50) Defects filter can be save using which option.
a) favorites
b) add to favorites
c) save
d) save as

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192







(51) What is goal of test set?
a) goal of a test plan
b) goal of release
c) goal of cycle
d) goal of requirements

(52) Which tab is used for audit trail of defects
a) Summary
b) history
c) audit trail
d) all defects

(53) Which field or fields are used for searching similar defects
a) Summary and description
b) name and discription
c) history and summary
d) history and description

(54) What information can be viewed from Tools menu ( Select 2)
a) Document Library
b) Change project
c) Add new defect
d) Version of QC
e) knowledge base

(55) Test set tree consists of
a) Automated tests only
b) automated and performance tests
c) only manual tests
d) automated and manual tests

(56) Which of the following can be attached to the requirement
a) Linked requirements
b) system information
c) snap shots
d) release details
e) test plan

(57) Commonly used options for a module are available in which tool bar
a) standard tool bar
b) common toolbar
c) module tool bar
d) system toolbar

(58) What web client can be used with Quality Center 9.2?
a) Netscape
b) Safari
c) Firefox
d) Internet Explorer

(59) Which term describes the main function of Quality Center?
a) Test cases
b) repository
c) load test
d) defects

(60) What database can be used with Quality Center 9.2? Select two.
a) Access
b) Sybase
c) Microsoft SQL Server
d) Paradox
e) Oracle

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

(61) When designing test steps it is important to ensure that all aspects of the application are tested.'When writing test steps, what are two things that should be done to ensure clear and accurate steps? (Select 2)
a) Specify all actual results
b) use parameters in the step names
c) Specify pass and fail condictions for the step names
d) use the numbering system for the step names
e) use consistent terminology throughout the test

(62) What are the steps, in the correct order, to convert a requirement to a test?
a) make changes to the automatic conversion, select an automatic method
b) select convert to test, select the destination path, convert to automated test
c) select an automatic method, make changes to the automatic conversion, select the destination subject path
d) select the destination subject path, select an automatic method, make changes to the automatic conversion

(63) When you define tests inside of Quality Center, it is important that the tests are accurate and traceable. What are two other key pointers when defining tests? Select two.
a) simple
b) consistent
c) repeatable
d) convertible
e) automation
f) appropriate

(64) What test types can be created in Quality Center? Select three
a) Batch-test
b) Vugen-Test
c) lr-scenario
d) system-test
e) interface-test
f) wr-automated test

(65) How can you create a test plan tree?
a) Convert releases to tests
b) defined test folders and tests manually
c) save automated tests in quality center
d) define test names for each test needed

(66) Can you change the values of a called test's parameters?
a) no, values are assigned at run time
b) yes, if the called test is a template test
c) no, you must delete the called test and call it again
d) yes, right click and choose called test paramters

(67) Using the Excel Macro, what type of data can be imported into Quality Center? (Select three.)
a) defects data
b) test set data
c) test plan data
d) releases data
e) test instance data
f) requirements data

(68) What is a fixed column in Defects grid
a) column with static legth
b) column having flexible values
c) non scrolling column
d) column with predefined width

(69) What are testing levels used while doing risk based testing
a) All
b) basic
c) None
d) Unit
e)functional
e)performance

(70) What are the two elements in the test lab module
a) execution flow
b) execution results
c) linked defects
d) requirements

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

(71) At what level is a main test tree folder
a) root
b) main
c) subject
d) folder

(72) What is a Requirements tree
a) hierarchical flow of requirements
b) folders with releases, cycles and requirements

(73) if the defect is linked to the test in the test set it has
a) indirect relationship with the test instance
b) direct relationship with the other defects for the test
c) indrect relatioship with other tests in the test set
d) direct relationship with other test set folder

(74) If the requirement is linked to the cycle then it gets linked to
a) only a cycle
b) all cycles in the release
c) release folder
d) all releases in the folder

(75) how many defects can one requirement have
a) only one defect per requirement
b) any number of defects
c) one defect for parent and one defect for child requirement

(76) if there is a dark blue line in the execution flow from one test to another it indicates
a) the test is called from another test
b) test can be executed only when previous test passed
c) test can be executed when previous test finised
d) there is no relationship

(77) what is next step if the test execution fails
a) rerun the test for 5 times
b) cleanup the test environment and rerun
c) clean up and do nothing

(78) what is execution condition for tests in qc
a) pass
b) finish
c) fail
d) done

(79) what type of repository is Quality center
a) file system
b) database
c) web based
d) client server

(80) in requirements what does graph of direct cover status shows
a) coverage status of requirements
b) coverage status of defects

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

(81) defect status display which of the following
a) defect life cycle
b) defect estimation
c) defect age
d) defect coverage

(82) what does private defect data used for
a) only the tests user is working on
b) all users can use this data
c) only users in my group can use this data
d) data is available across all projects

(83) While logging a new defect in QC, the field "Detected By" is
a) Mandatory & must be filled while logging a defect
b) Not Mandatory
c) Mandatory and prepopluated by the name of the user who logged it

(84) When a defect is logged from the manual runner for a test steps, it is automatically linked to
a) test run
b) test set
c) test
d) test instance

(85) In Tools> Excel report generator window, the field designer is populated with the name of
a) site admin
b) Project Manager
c) User who is logged in for the report
d) Person who is designed the report

(86) You can import following with Excel Addin
a) Defect, test plan, test set
b) defect, test plan, requirements
c) Release, defect, test plan

(87) Following type of tests can be exeucted from test lab
a) manual only
b) manual & automated
c) manual & automated but automated cannot follow manual test

(88) What are entities that determine the testing level in QC?
A) Impact analysis
b) risk type
c) Risk analysis
d) failure probability
e) resource availability? (Select any 2)

(89) What are different levels of testing once risk is quantified?
A) Basic,
b) all
c) none.. (Select any 2)

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 1

1) Test management with Quality Center involves …. Phases.
A) Four
B) Five
C) Six
D) Seven

2) The phases of Test management with Quality Center in order are:
A) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Track Defects
B) Specify Requirements, Specify Releases, Plan Tests, Execute Tests, Track Defects
C) Specify Requirements, Plan Tests, Specify Releases, Execute Tests, Track Defects
D) Specify Releases, Specify Requirements, Plan Tests, Track Defects, Execute Tests

3) By creating a list of authorized users and assigning each user a password and user group,
you control the kinds of additions and modifications each user makes to the project.
A) True
B) False

4) The …….determines the privileges that the user has within a project.
A) User ID
B) User Name
C) User group
D) User SID

5) You can import data from Word or Excel to a Quality Center project.
A) True
B) False

6) Quality Center 9.2 prompts you to install Microsoft .NET ...... if it is not already installed on your machine.
A) Framework 2.0
B) Framework 1.0
C) Framework 3.0
D) Framework 4.0

7) When you connect to a project, the Quality Center main window opens and displays the module in which
you were last working.
A) True
B) False

8) The ….can change and override a user’s properties or password.
A) Global Administrator
B) Site Administrator
C) Administrator
D) QC Administrator

9) You can filter Quality Center data to display only those records that meet the criteria that you define.
How many filters can you define
A) Single item as a filter
B) Two items as a filter
C) Multiple items as filter
D) Five items as filter

10) In the test plan tree, you can define the ……filter for associated test sets as “Open”.
This ensures that only tests that belong to an open test set are displayed.
A) Double
B) Twice
C) Cross
D) Multiple

Answers
1) B,
2) A,
3) A,
4) C,
5) A,
6) A,
7) A,
8) B,
9) C,
10) C

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 2

11) By default, records appear in Quality Center in the

A) Increasing Order
B) Decreasing Order
C) Order in which they were added
D) None of these

12) You can save filter and sort information as a favorite view and then load it as needed.

A) True
B) False

13) You can copy and paste the filter, sort, and group by settings to another project.

A) True
B) False

14) You can also share the settings (filter, sort, and group by settings) with another user by pasting
them to an e-mail or a text file.

A) True
B) False

15) When you use text search, the search ignores

A) articles (a, an, the)
B) coordinate conjunctions (and, but, for, nor, or);
C) Boolean operators (and, or, not, if, or, then).
D) All of above

16) You can export the data in a grid as a

A) text file,
B) Microsoft Excel worksheet,
C) Microsoft Word document, or
D) HTML document.
E) All of above

17) …….. alerting functions available in Quality Center

A) Three
B) Four
C) Two
D) Five

18) The alerting functions in Quality Center are:

A) Automatic notification alerts, Follow up alerts
B) Email alerts, Automatic notification alerts, Follow up alerts
C) Defect alerts, Email alerts, Automatic notification alerts, Follow up alerts
D) Final alerts, Email alerts, Automatic notification alerts, Follow up alerts

19) You can create traceability links between ……….. in the Requirements module.

A) Requirements
B) Test Cases
C) Tests
D) Defects

20) You can associate a test instance with a defect. This is performed by creating ………..in the
Test Plan module, or by adding a defect during a manual test run.

A) Linked Tests
B) Linked Defects
C) Linked Errors
D) Linked Data

Answers
11) C,
12) A,
13) A,
14) B,
15) D,
16) E,
17) C,
18) A,
19) A,
20) B

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 3

21) You can view a list of alerts for a ………… entity.

A) A test in the test plan tree or Test Grid
B) A test instance in the Execution Grid
C) None of above
D) Both A) & B)

22) A red flag indicates that the alert is.........

A) New
B) Old
C) Follow up
D) Urgent

23) A gray flag indicates that the alert ………..

A) New
B) has already been read
C) Follow up
D) Urgent

24) A follow up flag is specific to your user login name.
Anyone else viewing the record does not see your follow up alert.

A) True
B) False

25) Quality Center assigns the image a unique file name with a ..... extension.

A) .jpeg
B) .gif
C) .doc
D) .jpg

26) A ………..is a view of a Quality Center window with the settings you apply to it.

A) Personal View
B) My view
C) Favorite View
D) My QC View

27) You save favorite views in ........

A) Favorite folder
B) Personal folder
C) Both A) & B)
D) Public & Private folder

28) You can define the number of views displayed on the menu by setting the ……………..
parameter in the Site Configuration tab in Site Administration.

A) favorites
B) favorites_Depth
C) favorites_view
D) favorites_Path

29) The requirements specification workflow consists of the following:

A) Define Testing Scope, Create Requirements, Detail Requirements, Assign to Releases, Analyze Requirements
B) Define Testing Scope, Detail Requirements, Create Requirements, Assign to Releases, Analyze Requirements
C) Define Testing Scope, Create Requirements, Detail Requirements, Analyze Requirements, Assign to Releases
D) Define Testing Scope, Create Requirements, Analyze Requirements, Detail Requirements, Assign to Releases

30) Requirement topics are recorded in the Requirements module by creating a

A) Requirements cycle
B) Requirements tree
C) Requirements plan
D) Requirements module

Answers
21) D,
22) A,
23) B,
24) A,
25) D,
26) C,
27) D,
28) B,
29) A,
30) B

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 4

31) QA Manager changes a requirement from a ……….. status to a Reviewed status once it is approved.

A) Released
B) Tested
C) Not reviewed
D) None of these

32) You can also import requirements to your Quality Center project from Microsoft Word, Excel,
or other third-party requirement management tools. To import requirements, you must first install the appropriate………

A) HP Third Party add-in.
B) HP Quality Center add-in.
C) HP Quality Center
D) HP Quality Center License

33) The Requirements Grid view enables you to display requirements in a …………….view.

A) Flat
B) Hierarchical
C) Flat-hierarchical
D) Flat non-hierarchical

34) The …………view enables you to analyze the breakdown of child requirements according to test coverage status..

A) Coverage Analysis
B) Coverage Requirements
C) Coverage
D) Coverage Tests

35) You can access the Requirements menu bar from the Requirements module by pressing the shortcut key …….

A) F1
B) F9
C) Ctrl + R
D) Alt + R

36) You can use the ………to restrict and dynamically change the fields and values in the Requirements module.

A) Script Edit
B) Scriptor Editor
C) Script Editor
D) Script Editing

37) The Requirements module enables you to define and manage your……...

A) requirements
B) All requirements
C) some requirements
D) Tedious requirements

38) You can rename or delete Requirements root folder.

A) true
B) False

39) You can search for a particular requirement in the requirements tree or in the requirements grid using the …….command.

A) Search
B) Find
C) Search All
D) Find All

40) You can replace field values in the requirements tree or in the requirements grid using the …….command.

A) Replace
B) Replace All
C) Find & Replace
D) Replace & Find

Answers
31) C,
32) B,
33) D,
34) A,
35) B,
36) C,
37) A,
38) B,
39) B,
40) A

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 5

41) By default, Quality Center sends e-mail in HTML format. To send e-mail as plain text instead, edit the ……. parameter in the Site Configuration tab in Site Administration.

A) EMAIL_FORMAT
B) EMAIL_FORM
C) MAIL_FORMAT
D) QC_MAIL_FORMAT

42) You can copy a requirement within the same project or between projects. Which of the below items are copied at the time of copying a requirement.

A) Test coverage.
B) defect linkage.
C) risk-based quality management data
D) All of above
E) None of above

43) You can also move a requirement to a new location in the requirements tree by dragging it..

A) True
B) False

44) You can delete a requirement from the Requirements module. Deleting a requirement does not delete its child requirements, tests coverage, requirement traceability links, and defects linkage..

A)True
B) False

45) There are two methods you can use to create tests from requirements:

A) Convert Requirements to Tests & Generate a Test from Requirements
B) Convert Requirements to Tests & Convert a Test from Requirements
C) Convert Requirements to Tests & Generate a Requirement from Tests
D) Convert a Test from Requirements & Generate Requirements to Tests

46) When analyzing the impact of a change proposed in a specific requirement, the traceability links indicate the other ...... that the change might affect.

A) tests
B) requirements
C) tests & requirements
D) None

47) ...... links indicate requirements that affect a selected requirement. .....links indicate requirements that are affected by a selected requirement.

A) Trace from, Trace to
B) Trace to, Trace from
C) From trace, To trace
D) None of above

48) When a requirement changes, Quality Center alerts the affected requirements. The alerts can be seen by.......

A) Author of the requirement
B) users authorized by the Author of the requirement
C) all users
D) Administrator

49) while Defining Traceability Relationships, You cannot add a requirement traceability link by dragging a requirement from the requirements tree to the appropriate grid..

A) True
B) False

50) While viewing Traceability Impact, the Impact Analysis tab helps you understand the many associations and dependencies that exist between the ........ by displaying them in a hierarchical tree structure.

A) Tests
B) Requirements
C) Both
D) None

Answers
41) C,
42) E,
43) A,
44) B,
45) A,
46) B,
47) A,
48) C,
49) B,
50) B

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 6

51) Each requirement type with risk-based quality management enabled supports either.

A) risk analysis or risk assessment
B) risk breakdown or risk assessment
C) risk breakdown or risk review
D) risk analysis or risk evaluation

52) Performing a risk-based quality management analysis for an analysis requirement involves the following steps

A) Determine Risk groups, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy
B) Determine Risk Categories, Define Testing guidelines Settings, Finalize Testing Policy, Analyze Testing Strategy
C) Determine Risk Categories, Define Testing Policy Settings, Finalize Testing guidelines, Analyze Testing Strategy
D) Determine Risk Categories, Define Testing Policy Settings, Finalize Testing Policy, Analyze Testing Strategy

53) An ...... requirement is a requirement belonging to a type that represents higher levels in the requirements tree hierarchy, such as the Folder type.

A) analysis
B) assessment
C) Policy
D) Test

54) An ....... requirement is a requirement belonging to a type that represents requirements that are children of analysis requirements and at a lower level in the requirements tree hierarchy.

A) analysis
B) assessment
C) Policy
D) Test

55) For each assessment requirement under the analysis requirement, you determine the Risk Category. The Risk Category is composed of two factors.

A) Business Probability and Failure Criticality
B) Business Vitality and Failure Probability
C) Business Criticality and Failure Probability
D) Business Criticality and Failure Possibility

56) The Business Criticality of a requirement has three possible values:.....

A) Critical, Important, Nice to Have
B) Critical, Importance, Nice to Have
C) Critical, Important, Nice to Had
D) None of these

57) The Failure Probability of a requirement has three possible values:...

A) High, Standard, Low
B) High, Average, Low
C) High, Medium, Low
D) None of these

58) Quality Center defines four Testing Levels:.

A) Full, Partial, Basic, and Low
B) Full, Partial, Basic, and None
C) Full, Half, Basic, and None
D) Full, Partial, Critical, and None

59) The Business Criticality of a requirement is a measure of how likely a test on the requirement is to fail, based on the technical complexity of the requirement’s implementation, without consideration of the requirement’s impact on the business.

A) True
B) False

60) The Failure Probability of a requirement is a measure of how important the requirement is to your business

A) True
B) False

Answers
1) A,
2) D,
3) A,
4) B,
5) C,
6) A,
7) C,
8) B,
9) B,
10) B

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 7

61) During Requirement Risks calculation, the ..... displays the requirements for which you did not determine a Risk Category or exclude explicitly from the analysis

A) missing assessment link
B) missing assessment field
C) missing assessment value
D) missing assessment relation

62) A good test plan enables you to assess the quality of your application ....... in the testing process.

A) at the beginning
B) at the end
C) at the point
D) at the middle

63) Which of the item is not a part of "Developing a test plan" in QC.

A) Design Test Steps
B) Design Tests
C) Automate Tests
D) Define Testing Policy Settings

64) You can access the Test Plan menu bar from the Test Plan module by pressing the shortcut key .....

A) F7
B) F9
C) F12
D) F11

65) To find a specific test by Test ID in the Test Grid, choose ......, and enter the test ID

A) Test > Go to Test
B) Test > find Test
C) Test > search Test
D) Test > link Test

66) In relation to a test plan module, You can add user-defined fields and change the label of any of the fields in the Test Grid

A) True,
B) False

67) You can use the ..... to restrict and dynamically change the fields and values in the Test Grid.

A) text editor
B) script editor
C) scriptor editor
D) scripts editor

68) The typical application is too large to test as a whole. The Test Plan module enables you to divide your application according to ........

A) functionality
B) requirements
C) test plans
D) test modules

69) During the testing process, you may need to modify your test plan. You can update the test plan tree ......

A) at the beginning
B) at the end
C) at any time
D) in the middle

70) Developing and editing a test plan tree requires appropriate user ......

A) IDs
B) requirements
C) permissions
D) passwords

Answers
1) A,
2) C,
3) D,
4) B,
5) A,
6) A,
7) B,
8) A,
9) C,
10) C

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 8

71) To set a QuickTest Professional test as a template test, right-click the test in the test plan tree, and choose ......

A) Template Test
B) Template Tree
C) Template Plan
D) Template

72) You can change the label of any of the test detail fields.

A) True
B) False

73) A question mark icon in the test plan tree indicates that the QuickTest Professional add-in is ....... on your machine.

A) not activated
B) not installed
C) not enabled
D) not set

74) A ...... link is included in the e-mail, enabling the recipient to go directly to the test.

A) Link To Test
B) Move To Test
C) Go To Test
D) Test

75) In the Test Plan module, you create ....... by selecting requirements to link to a test.

A) RTM
B) requirements coverage
C) test coverage
D) SRS

76) Alternatively, in the Requirements module, you create ...... by selecting tests to link to a requirement.

A) RTM
B) requirements coverage
C) test coverage
D) SRS

77) A test can cover more than one requirement, and a requirement can be covered by only one test.

A) True
B) False

78) You can also create coverage between test instances and requirements. You can enable this feature using the ........... parameter in Site Administration

A) ALLOW_REQ_COVERAGE_BY_TEST_INSTANCE
B) ALLOW_TEST_COVERAGE_BY_REQ_INSTANCE
C) ALLOW_R_COVERAGE_BY_T_INSTANCE
D) None of above

79) Requirements coverage is created automatically when you convert a requirement to a test. Therefore, even if you have not yet added
requirements coverage, it may already exist.

A) True
B) False

80) You can also define requirements coverage by dragging a requirement in the requirements tree to the coverage grid. The requirement is added to the coverage grid without its child requirements.

A) True
B) False

Answers
71) A,
72) A,
73) B,
74) C,
75) B,
76) C,
77) B,
78) A,
79) A,
80)

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 9

81) Test coverage is created automatically when you generate a requirement from a test.

A) True
B) False

82) In the Requirements module, you can use the ........ view to examine the status of your requirements.

A) Coverage Analysis
B) Coverage Breakdown
C) Requirements Status
D) Coverage Status

83) By default, coverage is available only for the following requirement types: ......

A) Functional, Testing, and Defined.
B) Functional, Testing, and Undefined.
C) Functional, System, and Undefined.
D) Functional, Review, and Undefined.

84) You can create design steps for ..........

A) manual and
B) automated tests
C) SRS
D) Both A and B

85) To increase the flexibility and power of a test, you can add ........to the called test and to the tests that call it.

A) Input Values
B) Output Values
C) Parameters
D) None of above

86) You do not need to set a test as a template test to be able to call it or to add parameters. Marking a test as a template test is used for filtering purposes only.

A) True,
B) False

87) If you do not assign values to parameters when creating a test call, you are prompted to do so when you call this test from another test, when you add your test to a test set, or when you run your test.

A) True
B) False

88) You can navigate between steps in the Design Step Editor using shortcut keys. Use ...... to access the first step.

A) ALT+LEFT
B) ALT+RIGHT
C) ALT+HOME
D) ALT+ UP

89) While generating automated test scripts, what does WR-AUTOMATED automated test type means.

A) A test that is created by Winrunner
B) A test that is executed by Winrunner
C) A test that is deleted by Winrunner
D) None of above

90) To run a system test, you must install the System Execute Remote Agent Add-in and the HP Quality Center Connectivity Add-in on the machine where the test is to be run.

A) True
B) False

Answers
81) B,
82) A,
83) B,
84) D,
85) C,
86) A,
87) A,
88) C,
89) B,
90) B

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 10

91) Using Quality Center Test Lab module, executing tests also consists of ....

A) Run Tests Automatically
B) Run Tests Manually
C) Both A and B
D) None of above

92) You can access the Test Lab menu bar from the Test Lab module by pressing the shortcut key......

A) F6
B) F7
C) F8
D) F9

93) The Test Lab module includes the following toolbars:

A) Test Set and Select Tests
B) Test Select and Set Tests
C) Set Test and Tests Select
D) None of above

94) In the Test Lab Module, in Execution Grid Columns, the column Exec Date means

A) The date on which the test was first executed.
B) The date on which the test was last executed
C) The date on which the test was executed
D) The date on which the test will be executed in future

95) You can add user-defined fields and change the label of any of the fields in the Execution Grid.

A) True
B) False

96) You can organize test execution by creating ........

A) test modules
B) test flows
C) test beds
D) test sets

97) While creating test sets, after you design tests in the Test Plan module, you create a ..........

A) test sets tree
B) test sets flow
C) test sets grid
D) test sets rows

98) By default, the uppermost level in a test sets tree is the ..........

A) Level 0 folder
B) Top folder
C) Highest level folder
D) Root folder

99) You can also use the ............. in the Test Instance Properties dialog box (Changing the Default Failure Rules for Specific Tests) to set the on failure rules for a test in a test set.

A) Run Events view
B) Run Events Grid
C) Run Events menu
D) Run Events module

100) You can also drag the test sets between lists.

A) True
B) False

Answers
1) C,
2) D,
3) A,
4) B,
5) A,
6) D,
7) A,
8) D,
9) A,
10) A

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 11

101)
The Execution Flow tab enables you to watch the execution process as it happens and to control the way your tests are executed.

A) True
B) False

102)
In the Execution Flow, a dashed line -- -- -> arrow indicates that the test

A) is to be executed after the previous test, with no conditions.
B) is to be executed only if the previous test has status Finished
C) is to be executed only if the previous test has status Passed
D) None

103)
You can delete a ....execution condition(s) connected to a test.

A) Single
B) Two
C) Three
D) All

104)
When we Run a test, in the Manual Test Run window, by default which option is selected

A) Manual Runner (Run according to the order in the
Execute Grid)
B) Manual Runner (Run according to the order in the
Executing Grid)
C) Manual Runner (Run according to the order in the
Execution Grid)
D) Manual Runner (Run according to the order in the
Execution Grind)

105)
You can assign multiple values to a parameter during a test run.

A) True
B) False

106)
If a manual test run was paused during execution, you can continue the run at a later stage.

A) True
B) False

107)
You can run tests automatically on ......

A) Your machine
B) Remote Hosts
C) Both A & B
D) None

108)
To run several test sets concurrently on multiple remote hosts, open a new Automatic Runner dialog box instance for each test set.

A) Auto Runner
B) Automate Runner
C) Automatic Runner
D) Manual Runner

109)
When you run QuickTest Professional tests from the Test Lab module, they are automatically run in Fast mode. They cannot be run in Normal mode.

A) True
B) False

110)
You can only view the Execution Log even if you did not select Enable Log in the Automatic Runner dialog box before you executed the test.

A) True
B) False

Answers
101) a,
102) a,
103) d,
104) c,
105) b,
106) a,
107) c,
108) c,
109) a,
110) b

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 12

111)
You can view the test results from the ...........

A) Test Instance dialog box.
B) Test Properties dialog box
C) Test Instance Properties dialog box
D) None

112)
The Linked Defects view on the sidebar of Test Instance Properties dialog box displays:

A) linked defects and requirements coverage for a test instance
B) only linked defects for a test instance
C) linked defects and history for a test instance
D) linked defects and test results for a test instance

113)
Quality Center enables you to compare the results of a test run with the results of previous runs.

A) True
B) False

114)
In the Test Instance Properties dialog box, You can view and edit the On Failure rules for an automated test instance using the ..... view.

A) Automated
B) Details
C) Run Events
D) Both A & C

115)
You track defects in the Quality Center Defects module, which you open by clicking the ...... button on the sidebar.

A) Track Defects
B) Open Defects
C) Defects
D) Log Defects

116)
To find a specific defect by Defect ID in the Defects Grid, choose ....

A) Defects > Defect
B) Defects > Move To Defect
C) Defects > Set Defect
D) Defects > Go To Defect

117)
Each line in the Defects Grid displays a separate defect record.

A) True
B) False

118)
You cannot add user-defined fields and change the label of any of the fields in the Defects Grid.

A) True
B) False

119)
You can use the ......... to restrict and dynamically change the fields and values in the Defects Grid.

A) Scripting Editor
B) Notepad Editor
C) QC Editor
D) Script Editor

120)
You can link defects to other Quality Center entities, such as requirements, tests and other defects.

A) True
B) False

Answers
111) c,
112) a,
113) a,
114) c,
115) c,
116) d,
117) a,
118) b,
119) d,
120) a

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 13

121)
You can add a new defect to a Quality Center project from any module at any stage of the testing process.

A) True
B) False

122)
There are two methods you can use to conduct a search for similar/related defects:

A) Find parallel Defects & Find parallel Text.
B) Find related Defects & Find related Text.
C) Find Similar Defects & Find Similar Text.
D) Find all Defects & Find all Text.

123)
You can update defects directly in the ......, or in the ..... dialog box.

A) Defects Grid
B) Defects Detail
C) Defects Module
D) Both A & B
E) Both B & C

124)
You can only see changes made to a defect for selected fields predefined by the project administrator in Project Customization.

A) True
B) False

125)
By default, Quality Center sends e-mail in HTML format. To send
e-mail as plain text instead, edit the parameter in the Site Configuration tab in Site Administration

A) M_FORMAT
B) MAIL_FORMAT_ID
C) MAIL_FORM
D) MAIL_FORMAT

126)
You can link a defect to the run steps and other defects.

A) True
B) False

127)
You can only remove direct links from the Linked Defects grid. Indirect links are removed automatically when the direct links are removed.

A) True
B) False

128)
Quality Center reports can be generated from the

A) Requirements,Test Plan,Test Lab,Defects modules.
B) Requirements,Test Plan,Defects modules.
C) Requirements & Test Plan modules.
D) Requirements,Test Plan,Test Lab modules.

129)
You can export grid data as a text file, Microsoft Excel spreadsheet, Microsoft Word document, or HTML document. You export data from the

A) Requirements Grid & Defects Grid.
B) Requirements Grid,Execution Grid, or Defects Grid.
C) Requirements Grid, Test Grid, Execution Grid, or Defects Grid.
D) Requirements Grid, Test Grid, Execution Grid.

130)
How many Reports (Not Sub-Reports) are available in Requirements module.

A) 5
B) 6
C) 7
D) 4
Answers
121) A ,
122) C ,
123) D,
124) A ,
125) D ,
126) A ,
127) A ,
128) A ,
129) C ,
130) B

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 14

131)
Quality Center enables you to generate graphs from the .........

A) Requirements module
B) Test Plan module
C) Test Lab module
D) Defects module
E) Both A & C
F) All of Above

132)
Requirements -Summary Graph

A) Shows how many requirements accumulated in a Quality Center project at specific points during a period of time.
B) Shows the history of changes to specific requirement fields in a Quality Center project
C) Shows how many requirements are currently in a Quality Center project.
D) Shows how many tests are currently in a Quality Center project.

133)
By default, the graph appears as a

A) pie chart,
B) bar chart
C) Pareto chart
D) Both A & B

134)
You can also use the Graph Wizard to guide you through the graph creation process.

A) True
B) False

135)
You can determine how information appears in the graph using the .....

A) graph toolbar.
B) graph settings
C) graph menu
D) Both A & C

136)
..... graphs enable you to create and display a dynamic graphical representation of data related to test plans and test sets.

A) Live Value
B) Live Analysis
C) Live Analytics
D) Both A & C

137)
You use Live Analysis graphs to view data that relates to a .... folder.

A) test subject
B) test set
C) test category
D) Both A & B

138)
The Live Analysis graphs that you create are unique for your user login.

A) True
B) False

139)
The Quality Center Document Generator enables you to create a Microsoft Word document containing a project’s requirements, planning, test list, test set folders, and defect tracking data.

A) True
B) False

140)
The Document Generator enables you to create a hard copy of the data contained in a Quality Center project.

A) True
B) False

Answers
131) F ,
132) C ,
133) B,
134) A ,
135) A ,
136) B ,
137) D ,
138) A ,
139) A ,
140) A

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 15

141)
You can define a logo for the project document, and save the image so that it is available for other users in the current project. If you do not select an image, the Document Generator uses the Mercury logo in the project document.

A) True
B) False

142)
While specifying Requirements module data (Generating Project Documents) Microsoft Word is limited to .... header levels in the table of contents.

A) Seven
B) Eight
C) Nine
D) Ten

143)
You use the ...... pages to specify the information from the test plan tree view of the Test Plan module that should appear in the project document.

A) Subject Tree
B) Subject Tests
C) Subject plans
D) Both A & B

144)
You use the ........ pages to specify the information from the Test Lab module that should appear in the project document.

A) Tests Lab, Test Set, Tests, and Run
B) Test Labs, Test Sets, Tests, and Runs
C) Test Lab, Test Gets, Tests, and Runs
D) Test Lab, Test Sets, Tests, and Runs

145)
You can generate a ...... that enables you to quickly see how the document will look, without all the detail included.

A) view project document
B) preview project document
C) pre project document
D) None

146)
You can generate Excel reports that enable you to export Quality Center data to Microsoft Excel and analyze the data from within Excel.

A) True
B) False

147)
You can export Quality Center data to Microsoft Excel. You cannot create a report with parameters.

A) True
B) False

148)
Most of the Excel Reports functionality is unavailable if you belong to a user group that has the necessary permissions.

A) True
B) False

149)
After you have added a report to the Excel Reports tree, you must define which project data you want to include in the report. You define this data by creating .... to extract the data.

A) Test Queries
B) Lotus Queries
C) Excel Macros
D) SQL queries

150)
To view the database type used for your project database, click the... button.

A) Database in use
B) Database Type
C) Get Database
D) Database version

Answers
141) B ,
142) C ,
143) D,
144) D ,
145) B ,
146) A ,
147) B ,
148) B ,
149) D ,
150) B

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 16 - Basics

1)
You access Quality Center over the ......, via a Web browser.

A) Internet
B) a corporate intranet
C) Mobile Internet
D) Both A & B

2)
Quality Center also features a sophisticated system for tracking application
defects, enabling you to monitor defects closely from initial detection until
resolution.

A) True
B) False

3)
Test management with Quality Center involves five phases:

A) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Run Tests.
B) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Track Defects.
C) Specify Releases, Specify Requirements, Plan Tests, Execute Tests, Analyze Tests.
D) Specify Releases, Specify Requirements, Plan Tests, Analyze Tests, Track Defects.

4)
Each Quality Center project is supported by a ...... that stores project information.

A) Root folder
B) Database
C) Flat File
D) Both B & C

5)
Quality Center enables you to manage user access to a project. The ..... determines the privileges that the user has within a project.

A) QC group
B) user_Account group
C) Account group
D) user group

6)
You can import data from...... to a Quality Center project.

A) Word or Notepad
B) Word or Wordpad
C) Word or Excel
D) Word or Power Point

7)
You launch Quality Center on your machine from your Web browser.

A) True
B) False

8)
Quality Center prompts you to install ...... if it is not already installed on your machine.

A) Microsoft Java 2.0
B) Microsoft Visio 13.0
C) Microsoft Visual studio 2.0
D) Microsoft .NET Framework 2.0

9)
Quality Center has the following modules, which are accessible from the sidebar:

A) Releases, Requirements, Test Plan, Test Lab, Defects, Analysis
B) Releases, Requirements, Test Plan, Test Lab, Defects, Business Components
C) Releases, Requirements, Test Plan, Test Lab, Defects, Analysis
D) Releases, Requirements, Test Plan, Test Lab, Defects

10)
When you customize your project, you can instruct Quality Center to preserve a log of values for the system and user fields in your Requirement, Test, Test Set, Test Instance, and Defect entities.

A) True
B) False

11)
The ..... can send messages to users connected to Quality Center projects informing them about important maintenance or other issues.

A) site administer
B) site Controller
C) site Analyser
D) site administrator

12)
Quality Center organizes and displays data in ......:

A) grids
B) trees
C) Folders
D) Both A & B

13)
You can no longer customize data by specifying the order in which columns appear,
and by changing column size.

A) True
B) False

14)
You can filter Quality Center data to display only those records that meet
the criteria that you define.

A) True
B) False

15)
When defining a filter, you can also include a cross filter. This is an advanced
....... on an associated item such as requirements, tests, test sets, or
defects.

A) Secondary filter
B) Primary filter
C) cross filter
D) Second filter

16)
By default, records appear in Quality Center according to the ....

A) Increasing order
B) Decreasing order
C) order in which they were added.
D) order in which they were deleted.

17)
You cannot copy and paste the filter, sort, and group by settings to and from the
Clipboard.

A) True
B) False

18)
You can use text search to search for records in predefined fields of the ........

A) Requirements, Test Plan, and Defects modules.
B) Releases, Test Plan, and Defects modules.
C) Requirements and Defects modules.
D) Requirements, Execute Tests, and Defects modules.

19)
If you have defined filter conditions for a module, you can restrict the search to the filtered records, or you can search all records in the module

A) True
B) False

20)
Text search is only available if it has been enabled for the project.

A) True
B) False

21)
You can export the data in a grid as a ......

A) text file, Microsoft Excel, Microsoft Word, or HTML document.
B) text file, Microsoft Excel, Microsoft Word
C) text file, Microsoft Excel, or HTML document.
D) Microsoft Excel, Microsoft Word, or HTML document.

22)
When a requirement, test, or defect changes, Quality Center alerts the associated entities and can notify those responsible for any associated entities.

A) True
B) False

23)
A ..... indicates that the alert is new. A gray flag indicates that the alert has already been read.

A) Green flag
B) Pink flag
C) red flag
D) Blue flag

24)
Quality Center enables you to add your own alerts, in addition to automatic traceability notifications. You can use ..... flags to remind yourself to follow up on something.

A) Alert Me
B) follow up
C) follow Me
D) follow

25)
Throughout the testing process, you can add attachments to help illustrate your work.

A) True
B) False

26)
You can use a Uniform Resource Locator (URL) to a Quality Center record as an attachment.

A) True
B) False

27)
A follow up flag is specific to your user login name. Anyone else viewing the record does not see your follow up alert.

A) True
B) False

28)
A ....... is a view of a Quality Center window with the settings you apply to it.

A) Personal view
B) My view
C) favorite view
D) fav view

29)
By default, Quality Center displays the four most recently used views on the Favorites menu. You can define the number of views displayed on the menu by setting the ....... parameter in the Site Configuration tab in Site Administration.

A) FAVORITES_DEPTH
B) FAVORITES-DEPTH
C) FAVORITE_DEPTH
D) FAVORITE_DEPTHS

30)
You save favorite views in either a .... folder or a ..... folder. Views in a
.... folder are accessible to all users. Views in a ..... folder are accessible only to the user who created them.

A) public, private, public, private
B) Root, Base, Root, Base,
C) locked, unlocked, locked, unlocked
D) Both B & C

Answers
1) D ,
2) A ,
3) B,
4) B ,
5) D ,
6) C ,
7) A ,
8) D ,
9) B ,
10) A,
11) D ,
12) D,
13) B,
14) A,
15) C,
16) C,
17 B,
18) A,
19) A,
20) A,
21) A,
22) A,
23) C,
24) B,
25) A,
26) A,
27) A,
28) C,
29) A,
30) A

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 17 - Release Management

1)
You begin the application testing process by defining a releases tree in the.......

A) Requirements module
B) Releases module
C) Plan Tests module
D) Either B or C

2)
Releases tree enables the modeling of upcoming releases within a hierarchical tree structure.

A) True
B) False

3)
A release represents a ..... in one or more applications that willbe available for distribution at the same time.

A) group of releases
B) group of changes
C) group of defects
D) group of requests

4)
After defining the release, a QA manager defines ...... A ..... is a set of Development and quality assurance efforts performed to achieve a common goal based on the release timeline.

A) cycles, cycle
B) Tries, Try
C) Priorities, Priority
D) Files, File

5)
After defining the releases tree, the QA manager defines and reviews the........ in the Requirements module and assigns them to releases andcycles.

A) Plans
B) groups of plans
C) upcoming modules
D) requirements

6)
After the QA manager assigns requirements, the QA team leader assigns each..... folder in the Test Lab module to a cycle.

A) test sets
B) test set
C) tests set
D) testing set

7)
A ...... is a group of testinstances in a Quality Center project designed to achieve specific test goals.

A) test sets
B) test set
C) tests set
D) testing set

8)
A defect can be submitted to a Quality Center project from any module atany stage of the testing process.

A) True
B) False

9)
While reviewing and deciding which new defects need to be fixed, the QAmanager assigns them to the appropriate ..........

A) release and cycle
B) cycle and release
C) defect and cycle
D) cycle and defect

10)
The QA manager cannot track the progress of the testing process in real time by analyzing the releases tree and ensuring that it matches the release goals.

A) True
B) False

11)
In the Progress tab, in the Coverage Progress graph, the Planned coverage curve below the Assigned requirements curve indicates the percentage of requirements that are ..... throughout the release.

A) run
B) covered
C) passed
D) assigned

12)
The ....... helps you draw conclusions quickly and see the number ofdefects submitted over the course of a release or cycle.

A) Details tab
B) Attachments tabC) Progress tab
D) Quality tab

13)
The defects arecategorized by ...... in terms of how they impact system operation.

A) Priority
B) severity

14)
You can move a release folder or a release to a different location in thereleases tree.

A) True
B) False

15)
The Releases root folder can also bemoved.

A) True
B) False

16)
You can create a duplicate of a cycle within the same release.

A) True
B) False

17)
Deleting a release folder, release, or cycle, does not unassigns theassociated requirements, test set folders, and defects.

A) True
B) False

18)
You can also move a release folder or a release to a new location in thereleases tree by dragging it.

A) True
B) False

Answers
1) B ,
2) A ,
3) B,
4) A ,
5) D ,
6) B ,
7) B ,
8) A ,
9) A ,
10) B,
11) B ,
12) D,
13) B,
14) A,
15) B,
16) A,
17 B,
18) A

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

Quality Center Questions 18 - Requirements Specification

1)
After you define a releases tree in the Releases module, you continue the
application testing process by specifying ........

A) Requirements
B) Releases
C) Plan Tests
D) Either B or A

2)
Requirement topics are recorded in the Requirements module by creating a requirements ......

A) graph
B) tree
C) Path
D) plan

3)
The requirements ....... is a graphical representation of your requirements specification, displaying the hierarchical relationship between different requirements.

A) graph
B) plan
C) Path
D) tree

4)
For each requirement topic, a QA tester creates a list of ....... in the requirements tree.

A) detailed requirements
B) detailed specifications
C) detailed plans
D) detailed sub-requirements

5)
Each requirement in the tree is described in detail and cannot include any relevant attachments.

A) True
B) False

6)
After defining your requirements, you can add traceability between the requirements. When analyzing the impact of a change proposed in a specific requirement, ....... shows the other requirements that the change might affect.

A) equality
B) link-ability
C) traceability
D) cross-links

7)
QA managers assign the requirements to releases and cycles in the releases tree in the Releases module.

A) True
B) False

8)
The assigned requirements are then used as a basis for the test plan in the Test Plan module. The tests you create during the test plan phase are then linked to these requirements to create ......

A) linkages
B) linked-requirements
C) requirements plan
D) coverage

9)
QA managers review the requirements, they change a requirement from a Not Reviewed
status to a ..... status once it is approved.

A) Passed
B) Reviewed
C) Partially reviewed
D) Both B & C

10)
You can also import requirements to your Quality Center project from ........

A) Microsoft Word
B) Excel
C) other third-party requirement management tools
D) All of above

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

11)
In the Requirements Tree view, Indicator columns indicates that the specified requirement has

A) attachments, linked defects, alerts, and follow up flags
B) attachments, linked defects, alerts
C) attachments, linked defects and follow up flags
D) linked defects, alerts, and follow up flags

12)
To find a specific requirement by ReqID in the Requirements Tree view, choose ............., and enter the requirement ID.

A) Requirements > Find Requirement
B) Requirements > Go to Requirement
C) Requirements > Get Requirement
D) Requirements > Display Requirement

13)
The Requirements ...... view enables you to display requirements in a flat
non-hierarchical view. Each line in the .... displays a separate requirement.

A) File, file
B) hierarchical, hierarchy
c) Grid, Grid
D) Both B & C

14)
The ... Analysis view enables you to analyze the breakdown of child requirements according to test ..... status.

A) Plan
B) Requirement
C) Coverage
D) Task

15)
You can access the Requirements menu bar from the Requirements module by pressing the shortcut key ....

A) F6
B) F7
C) F8
D) F9

16)
The Requirement module field Direct Cover Status means

A) The current status of the requirement
B) The previous status of the requirement
C) The coming status of the requirement
D) The fixed status of the requirement

17)
You can add user-defined fields and change the label of any of the fields in the Requirements module.

A) True
B) False

18)
You start a requirements tree by adding requirements to the Requirements root folder.

A) True
B) False

19)
You can add, view, and edit Microsoft Word rich text from within Quality Center, without the need to edit the text in Word.

A) True
B) False

20)
You cannot update your requirements directly in the requirements tree or grid, or in the Requirement Details dialog box.

A) True
B) False

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

21)
You can search for a particular requirement in the requirements tree or in the requirements grid using the ....... command.

A) Search
B) Find
C) Look
D) Get

22)
You can send e-mail about a requirement to other users in your Quality Center project

A) True
B) False

23)
You cannot copy a requirement within the same project or between projects.

A) True
B) False

24)
Test coverage, defect linkage, and risk-based quality management data for the requirement are not copied.

A) True
B) False

25)
Methods you can use to create tests from requirements:

A) Convert Requirements to Tests
B) Generate a Test from Requirements.
C) Get a test from a requirement
D) Both A & B
E) Both B & C

26)
Using the Requirements Traceability tab in the Requirement Details view, you can add traceability links to and from a selected requirement. ....... links indicate requirements that affect a selected requirement. ....... links indicate requirements that are affected by a selected requirement.

A) Trace from, Trace to
B) Trace to, Trace from
C) Trace from select, Trace to select
D) Trace to select, Trace from select

27)
When a requirement changes, Quality Center alerts the affected requirements. The alerts can be seen by all users.

A) True
B) False

28)
You can display traceability relationships that exist between requirements in the ...... tab. This tab contains the Trace From and Trace To grids.

A) traceability
B) Relationships
C) Req-traceability
D) traceability-Req

29)
The ...... feature enables you to calculate at which level to test each requirement, based on the nature of the requirement and the resources you have available.

A) Level-based quality management
B) Calculate-based quality management
C) risk-based quality management
D) None of above

30)
You can assign or calculate the Risk Category of an assessment requirement. The Risk Category is composed of its .....

A) Business Criticality & Failure Probability
B) Business Probability & Failure Criticality
C) Priority & Severity
D) None of above

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

31)
Quality Center defines four Testing Levels:

A) First, second, third, and fourth
B) Full, Partial, Basic, and None
C) Full, Partial, Basic, and moderate
D) Partial,Basic, moderate and Advanced

32)
The ...... link displays the requirements for which you did not determine a Risk Category or exclude explicitly from the analysis.

A) missing risk assessment
B) miss assessment
C) missing assessment
D) exclude assessment

Answers
1) A ,
2) B ,
3) D,
4) A ,
5) B ,
6) C ,
7) A ,
8) D ,
9) B ,
10) D,
11) A ,
12) B,
13) C,
14) C,
15) D,
16) A,
17 A,
18) A,
19 A),
20) B,
21) B,
22) A,
23) B,
24) A
25) D ,
26) A,
27) A,
28) B,
29) C,
30) A,
31) B,
32) C

HP QC Certification Sample Papers (HP0-M15) dumps
By Jigar Gosai, India, Contact# +91-9825118192

5 comments:

  1. Hi,
    I need certification dumps for HPO-M31 and HPO-M39 exams.. please help me

    ReplyDelete
  2. This comment has been removed by the author.

    ReplyDelete
  3. Even I need (HP0-M31) dumps
    Can somebody send to me
    Khalilsg@gmail.com

    ReplyDelete
  4. I too require dumps for HP0-M31 exam.
    If anyone's having then please send it ro my email id anshulkharub@gmail.com

    ReplyDelete
  5. Hi Jigar,

    Congratulations for your work. Really the questions are very helpful to me. Can you please post any materials or user guide of the qc11.

    can you post the answers for the first 90 questions so that it will be more helpful




    ReplyDelete